EL ADOBE, Kern County — November 3, 2026. Public state records provide details about the physical construction that would link El Adobe's small drinking-water system with Lamont Public Utility District. A State Clearinghouse filing dated January 2023 explains the approved infrastructure concept, including new pipes, replacement wells and connections.
What infrastructure was proposed?
The plan calls for approximately 11,000 feet of ten-inch transmission pipeline and about 20,000 feet of eight-inch distribution pipeline. It would connect the area with a looped water network, replace the older El Adobe system and install 81 connections to existing meters. The project also describes replacement of Lamont's Wells 5, 11 and 12 and new remote monitoring capability.
What happens to existing wells?
According to the filed description, the old El Adobe Wells 1 and 2 would be abandoned, its two existing storage tanks would be removed and associated booster pumps decommissioned. These are the proposed construction components; the filing does not establish that abandonment had already occurred by late 2026.
How can residents track the build?
Ask LPUD for the latest project schedule and parcel-specific service-connection arrangements. A plan approved for environmental purposes should not be confused with a final as-built utility diagram or permission to connect without an agreement.
Primary source: California State Clearinghouse — El Adobe Water System Improvement Project. Records are dated; subsequent agency notices and monitoring may change the status.
Support El Adobe News
Choose how to support El Adobe News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “El Adobe News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from El Adobe News
- El Adobe's 2020 Census Count Was 391: Why Its Independent Water System Matters →
- El Adobe's Water Registry Still Lists Its Groundwater Wells and Regulatory Contacts →
- El Adobe Water Construction Deadline Was Extended to December 2027, State Report Shows →
- El Adobe Water Project Got $25.3 Million State Grant to Join Lamont's Water System →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.